To consider the report of the Director of Strategy, Performance and Governance (copy enclosed, Members’ Update to be circulated)*.
Minutes:
|
Application Number |
FUL/MAL/19/00458 |
|
Location |
Land Adjacent 9 St Peters Court, Bradwell-on-Sea |
|
Proposal |
Erection of 2No. detached 4 bedroom dwellings |
|
Applicant |
Great Canney Developments Ltd |
|
Agent |
Raymond Stemp Associates |
|
Target Decision Date |
12.06.2019 |
|
Case Officer |
Devan Lawson |
|
Parish |
BRADWELL-ON-SEA |
|
Reason for Referral to the Committee / Council |
Departure from the Local Plan 2017 |
A Members’ Update was submitted detailing a revised site map as shown on the agenda, agreed pre-commencement conditions and a further letter of objection.
Following the Officer’s presentation, Mr Raymond Stemp, the Agent, addressed the Committee.
A brief debate took place and the Committee acknowledged that the benefit with this application was that the development closed the gap and there was no more opportunity to extend further. It was also noted that having taken into account all material planning considerations the principle to erect a dwelling house had been established.
The Chairman proposed that the application be approved in accordance with the Officer’s recommendation, and this was seconded. The Chairman concurred that the development closed the gap and cannot be extended further.
The Chairman put the proposal to approve the application in accordance with the Officer’s recommendation to the Committee and this was agreed.
RESOLVED that the application be APPROVED subject to the following conditions:
1. The development hereby permitted shall begin no later than 3 years from the date of this decision.
2. The development hereby permitted shall be carried out in accordance with the following approved plans and documents: NDCM07JE_BP1.1, NDCM07JE_SP1.0, NDCM07JE_PSP1.0, 03, 04, 05, 06
3. No works shall be carried out above ground level until written details or samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details.
4. The development hereby permitted shall be carried out in accordance with the following approved plans: ATS/537/03, Illustrative Site Plan – LD, Illustrative Site Plan- WD, Proposed Reception/Spa Building Floor Plans & Elevations.
REASON To ensure that the development is carried out in accordance with the details as approved.
5. Full details of both hard and soft landscape works shall be submitted to and approved in writing by the local planning authority prior to any works occurring above ground level at the application site. These details shall include:
i) Finished levels;
ii) Means of enclosure, including gates;
iii) Car parking layouts;
iv) Vehicle and pedestrian access and circulation areas;
v) Hard surfacing materials;
vi) Indications of all existing trees and hedgerows on the land and identification of those to be retained; planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants noting species, plant supply sizes and proposed numbers/densities where appropriate.
The details set out in (i) to (v) above shall be implemented as approved prior to occupation of the dwelling and retained thereafter. Soft landscape works, as required by (vi) above, shall be carried out as approved within the first available planting season (October to March inclusive) following the occupation of any part of the development hereby approved unless otherwise agreed in writing by the local planning authority. If within a period of five years from the date of the planting of any tree or plant, or any tree or plant planted in its replacement, is removed, uprooted, destroyed, dies, or becomes, in the opinion of the local planning authority, seriously damaged or defective, another tree or plant of the same species and size as that originally planted shall be planted in the same place.
6. No building hereby permitted shall be occupied until surface water drainage
works shall have been implemented in accordance with details that shall first have been submitted to and approved in writing by the local planning authority. Before any details are submitted to the local planning authority an assessment shall be carried out of the potential for disposing of surface water by means of a sustainable drainage system, having regard to Defra's non-statutory technical standards for sustainable drainage systems (or any subsequent version), and the results of the assessment shall have been provided to the local planning authority.
Where a sustainable drainage scheme is to be provided, the submitted details shall:
i) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters;
ii) include a timetable for its implementation; and,
iii) provide, a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public authority or statutory undertaker and any other arrangements to secure the operation of the scheme throughout its lifetime.
7. Prior to any works above ground level details of the foul drainage scheme to serve the development shall be submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development.
8. No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to, and approved in writing by the local planning authority. The Statement shall provide for:
i) the parking of vehicles of site operatives and visitors;
ii) loading and unloading of plant and materials;
iii) storage of plant and materials used in constructing the
development;
iv) delivery, demolition and construction working hours.
The approved Construction Method Statement shall be adhered to throughout the construction period for the development.