To consider the report of the Director of Strategy, Performance and Governance (copy enclosed, Members’ Update to be circulated)*.
Minutes:
|
Application Number |
FUL/MAL/19/00400 |
|
Location |
Land at Myrtle Cottage, Stoney Hills, Burnham-On-Crouch, Essex |
|
Proposal |
Proposed 2 bedroom dwelling |
|
Applicant |
Mr & Mrs Wiffen |
|
Agent |
Greg Wiffen - Planman |
|
Target Decision Date |
06.06.2019 (EoT agreed: 21.06.2019) |
|
Case Officer |
Anna Tastsoglou |
|
Parish |
BURNHAM NORTH |
|
Reason for Referral to the Committee / Council |
Departure from the Local Plan 2017 |
A Members’ Update was submitted detailing representations received from the Parish/Town Council. Following the Officer’s presentation, the Applicant, Mr Wiffen, addressed the Committee.
A debate ensued and whilst there was sympathy for residents concerning the continued development in the area, it was also acknowledged that this application had been assessed against all material planning considerations and was found to be acceptable
It was further noted that given the area had been urbanised , given the planning history of the site and the appeals allowed. Therefore, the refusal of an application would need a very strong planning reason, proving demonstrable harm.
Councillor Fluker proposed that the application be approved in accordance with the Officer’s recommendation and this was duly seconded.
The Chairman put the proposal to approve in accordance with the Officer’s recommendation to the Committee and this was agreed.
RESOLVED that the application be APPROVED subject to the following conditions:
1. The development hereby permitted shall be begun before the expiration of
three years from the date of this permission.
2. The development hereby permitted shall be carried out in complete accordance with approved drawings GW08; GW01 A; GW02 A; GW05; GW03 and GW04 A.
3. Prior to their use in the development hereby approved, details or samples of the materials to be used in the construction of the external surfaces, including windows and doors, of the development hereby approved shall have been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details.
4. Prior to the occupation of the development hereby approved details of the 4.
boundary treatment of the site shall be submitted to and approved in writing by the Local Planning Authority. The boundary treatment shall be provided prior to the occupation of the dwelling hereby approved in accordance with the approved details and be retained as such in perpetuity.
5. Prior to the occupation of the development details of both hard and soft landscape works to be carried out shall have been submitted to and approved in writing by the Local Planning Authority. These details shall include the layout of the hard landscaped areas with the materials and finishes to be used and details of the soft landscape works including schedules of shrubs and trees to be planted, noting the species, stock size, proposed numbers/densities and details of the planting scheme's implementation, aftercare and maintenance programme. The hard landscape works shall be carried out as approved prior to the beneficial occupation of the development hereby approved unless otherwise first agreed in writing by the Local Planning Authority. The soft landscape works shall be carried out as approved within the first available planting season (October to March inclusive) following the occupation of the development, unless otherwise first agreed in writing by the Local Planning Authority. If within a period of five years from the date of the planting of any tree or plant, or any tree or plant planted in its replacement, is removed, uprooted, destroyed, dies, or becomes, in the opinion of the Local Planning Authority, seriously damaged or defective, another tree or plant of the same species and size as that originally planted shall be planted in the same place, unless the Local Planning Authority gives its written consent to any variation.
6. No development shall commence until a Construction Method Statement has
been submitted to, and approved in writing by, the local planning authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for:
• The parking of vehicles of site operatives and visitors
• Loading and unloading of plant and materials
• Storage of plant and materials used in constructing the development
• Wheel washing facilities
• Measures to control the emission of dust, noise and dirt during construction
Hours and days of construction operations.
7. No development works above ground level shall occur until details of the surface
water drainage scheme to serve the development has been submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development. The scheme shall ensure that for a minimum:
1) The development should be able to manage water on site for 1 in 100 year
events plus 40% climate change allowance.
2) Run-off from a greenfield site for all storm events that have a 100% chance of occurring each year (1 in 1 year event) inclusive of climate change should be no higher than 10/ls and no lower than 1/ls. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage (minimum rate 1l/s) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield)
You are advised that in order to satisfy the soakaway condition the following details will be required:- details of the area to be drained, infiltration rate (as determined by BRE Digest 365), proposed length, width and depth of soakaway, groundwater level and whether it will be rubble filled.
Where the local planning authority accepts discharge to an adopted sewer network you will be required to provide written confirmation from the statutory undertaker that the discharge will be accepted.
8. No development above ground level shall be occur until details of the foul
drainage scheme to serve the development have been submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development.
9. The vehicle parking area and associated turning area shown on plan GW 04A
shall be provided prior to the occupation retained in this form in perpetuity. The vehicle parking shall not be used for any purpose other than the parking of vehicles that are related to the use of the development unless otherwise agreed with the Local Planning Authority.
10. Details of the refuse and cycle stores shall be submitted to and approved in
writing by the Local Planning Authority prior to the first occupation of the development. The development shall be implemented in accordance with the approved details and be retained for such purposes in perpetuity thereafter.
11. Notwithstanding the details submitted with this application, no development shall
commence, other than that required to carry out additional necessary investigation which in this case includes demolition, site clearance, removal of underground tanks and old structures, and any construction until an investigation and risk assessment has been submitted to and approved in writing by the local planning authority. The risk assessment shall assess the nature and extent of any contamination on the site whether or not it originates on the site. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The report of the findings must include:
(i) a survey of extent, scale and nature of contamination;
(ii) an assessment of the potential risks to:
Human health,
Properly (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes,
Adjoining land,
Groundwaters and surface waters,
Ecological systems
Archaeological sites and ancient monuments;
(iii) an appraisal of remedial options, and proposal of the preferred option(s).
This must be conducted by a competent person and in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and the Essex Contaminated Land Consortium's 'Technical Guidance for Applicants and Developers' and is subject to the approval in writing of the Local Planning Authority.
12. No development shall commence, other than where necessary to carry out
additional investigation, until a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment has been submitted to and approved in writing by the local planning authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. The development hereby permitted shall not commence until the measures set out in the approved scheme have been implemented, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority may give approval for the commencement of development prior to the completion of the remedial measures when it is deemed necessary to do so in order to complete the agreed remediation scheme. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works.
This must be conducted by a competent person and in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and the Essex Contaminated Land Consortium's 'Technical Guidance for Applicants and Developers' and is subject to the approval in writing of the Local Planning Authority.
13. The approved remediation scheme must be carried out in accordance with its
terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works.
Following completion of measures identified in the approved remediation
scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be produced. This must be conducted by a competent person and in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and the Essex Contaminated Land Consortium's 'Technical Guidance for Applicants and Developers' and is subject to the approval in writing of the Local Planning Authority.
14. In the event that contamination is found at any time when carrying out the
approved development that was not previously identified it must be reported inwriting immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of condition [11], and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of condition [12]. This must be conducted in accordance with DEFRA and the Environment Agency's' Model Procedures for the Management of Land Contamination, CLR 11' and the Essex Contaminated Land Consortium's 'Technical Guidance for Applicants and Developers' and is subject to the approval in writing of the Local Planning Authority.
Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority in accordance with condition [13].
15. Notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extensions or separate buildings (other than ancillary outbuildings not exceeding 10 cubic metres in volume) shall be erected within the site.
16. The trees and hedges identified for retention on the approved plan drawing
number GW 04 A and the details included in the Tree report which is attached to and forms part of this permission shall be protected during the course of the development. The trees and hedges shall be protected by measures which accord with British Standard 5837:2012 (Trees in Relation to Construction). The protective fencing and ground protection shall be erected before the commencement of any clearing, demolition and building operations and shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Within the fenced protection zone(s) no materials shall be stored, no rubbish dumped, no fires lit and no buildings erected inside the fence, nor shall any change in ground level be made within the fenced area unless otherwise first agreed in writing by the local planning authority. If within five years from the completion of the development a tree or hedge shown to be retained is removed, destroyed, dies, or becomes, in the opinion of the local planning authority, seriously damaged or defective, a replacement shall be planted within the site of such species and size, and shall be planted at such time, as specified in writing by the local planning authority.
Supporting documents: