Agenda item

FUL/MAL/18/00619 - Land West Of Abbottswood, Beacon Hill, Great Totham

To consider the report of the Director of Strategy, Performance and Governance, (copy enclosed, Members’ Update to be circulated)*.

Minutes:

Application Number

FUL/MAL/18/00619

Location

Land West Of Abbottswood, Beacon Hill, Great Totham

Proposal

New four bedroom dwelling with detached car port

Applicant

Mr. and Mrs. Baker

Agent

Mr. Simon Plater – Plater Claiborne Architecture and Design

Target Decision Date

03 September 2018

Case Officer

Hilary Baldwin

Parish

Great Totham

Reason for Referral to the Committee / Council

Departure from the Local Development Plan and the Officer recommendation is for approval

 

The Officer presented their report to the Committee, after which Mr Chris Loon, from Springfield Planning and Development, spoke on behalf of the Applicant.

 

A short discussion ensued where Members expressed approval on the Parish Council being consulted.  It was noted that there would be little impact on neighbouring properties due to the height of trees along the boundary.

 

The Chairman put the Officer’s recommendation to a vote and the motion was duly carried.

 

RESOLVED that the application be APPROVED in accordance with the Officer’s recommendation and subject to the following conditions:

 

1.         The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

2.         The development hereby permitted shall accord with that shown on drawing

No's, 1601/C/10, 16018/C/11, 1601/C/12, 1601/C/13, 1601/14m, 1601/18/C, 1601/C/16, 1601/17/C and 13873/JD/1 which are specifically referenced on this decision notice and forms part of this permission.

3.         No development shall take place until written details or samples of all materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to the Local Planning Authority for approval in writing. The development shall be carried out in accordance with the approved materials.

4.         Prior to the commencement of the development details of the surface water drainage scheme to serve the development shall be submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development. The scheme shall ensure that for a minimum:

1)         The development should be able to manage water on site for 1 in 100

year events plus 40% climate change allowance.

2)         Run-off from a greenfield site for all storm events that have a 100%

chance of occurring each year (1 in 1 year event) inclusive of climate change should be no higher than 10/ls and no lower than 1/ls. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage (minimum rate 1l/s) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield)

            You are advised that in order to satisfy the soakaway condition the following details will be required:- details of the area to be drained, infiltration rate (as determined by BRE Digest 365), proposed length, width and depth of soakaway, groundwater level and whether it will be rubble filled.

Where the local planning authority accepts discharge to an adopted sewer network you will be required to provide written confirmation from the statutory undertaker that the discharge will be accepted.

5.         Prior to the commencement of the development details of the foul drainage scheme to serve the development shall be submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development.

6.         Notwithstanding the provisions of Article 3 of the Town & Country Planning (General Permitted Development) Order 2015 (or any Order amending, revoking or re-enacting that Order) no garages, extensions or separate buildings (other than ancillary outbuildings not exceeding 10 cubic metres in volume) shall be erected within the site without planning permission having been obtained from the local planning authority.

7.         Notwithstanding the provisions of Article 3 of the Town & Country Planning (General Permitted Development) Order 2015 (or any Order amending, revoking or re-enacting that Order) no dormer window or other form of addition or opening shall be constructed in the roof or gable walls of the development hereby permitted without planning permission having been obtained from the local planning authority.

8.         Prior to the first occupation of the proposed development, the proposed vehicular access shall be constructed at right angles to the highway boundary and to a width of 3.7 metres and shall be provided with an appropriate dropped kerb vehicular crossing of the footway/highway verge to the specifications of the Highway Authority.

9.         No unbound materials shall be used in the surface treatment of the proposed vehicular access within 6m of the highway boundary.

10.       No development shall take place, including any ground works or works of demolition, until a Construction Method Statement (CMS) has been submitted to, and approved in writing by, the local planning authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for:

i.          the parking of vehicles of site operatives and visitors

ii.         loading and unloading of plant and materials

iii.        storage of plant and materials used in constructing the development

iv.        wheel and under body washing facilities

11.       Prior to the first beneficial occupation of the dwelling hereby approved, the first floor eastern elevation windows as shown on drawings: 1601/C/11 and 1601/C/12 shall be opaque glazed and of a non-openable design with the exception of a top hung fanlight (which shall be at least 1.7m above internal floor level) and shall be retained as such thereafter. 

12.       No development shall take place until full details of both hard and soft landscape works to be carried including details of a planting implementation scheme, aftercare and maintenance and replacement programme out have been submitted to the Local Planning Authority for approval in writing. The scheme shall also include details of the retention and protection of hedges at the site boundaries.  The landscape works shall be carried out in accordance with the approved details with soft landscape works carried out within the first available planting season (October to March inclusive) following the commencement of the development.

13.       Prior to the commencement of the development, and before any equipment, machinery or materials are brought to the site for the purposes of the development, a written statement detailing the retention and protection of trees on the site shall be submitted to and approved in writing by the local planning authority. The submitted statement shall include a survey and assessment of all trees on the site and shall identify on a scaled drawing those trees to be retained and where arboricultural work is proposed. It shall also detail the measures and means of protecting the trees on the site. The development shall be carried out fully in accordance with the agreed details. If within five years from the completion of the development a tree which is agreed to be retained is removed, destroyed, dies, or becomes, in the opinion of the local planning authority, seriously damaged or defective, a replacement tree shall be planted within the site of such species and size, and shall be planted at such time, as specified in writing by the local planning authority.

14.       The carport hereby permitted within the site shall only be used for those purposes incidental to the enjoyment of the dwellinghouse to which it relates and not for any commercial or business purposes or as annexe accommodation. 

Supporting documents: