Agenda item

FUL/MAL/18/00416 - Land at Stock Chase, Heybridge, Essex

To consider the planning application and recommendation of the Director of Planning and Regulatory Services (copy enclosed).

 

Minutes:

ApplicationNumber

FUL/MAL/18/00416

 

Location

Land at Stock Chase
Heybridge
Essex

Proposal

Erectionof twodetached bungalows

Applicant

MrNick Barnes -MilbarnConstruction

Agent

MrMatthew Letten- SpectrumTownPlanningConsultants

TargetDecisionDate

13.07.2018

CaseOfficer

KathrynMathews TEL: 01621875805

Parish

HEYBRIDGE WEST

ReasonforReferralto theCommittee/ Council

Member CallIn –CouncillorIan Dobson–due tothepublic interestinthesite

 

The Officer presented the report to the Committee, and attention was drawn to the Members’ Update.

 

The application was discussed and Members were pleased with the improvement of the area.  It was noted that parking in the vicinity was at a premium and that offered with the property was considered generous.


Members queried whether the study room could be considered a second bedroom, and raised concern over the lack of storage in the property.  The Group Manager for Planning Service advised that there was no minimum space for storage required and it would be difficult to refuse an application on this matter unless there was a clear shortfall.

 

The Committee raised concern over drainage at the site due to its current condition and were pleased that the application would be addressing this issue.

 

Upon a vote being taken the application be APPROVED in accordance with the Officer’s recommendation.

 

RESOLVED that the application be APPROVED, subject to the following conditions:

1                   The developmenthereby permittedshallbe begunbefore theexpirationof threeyears fromthedate ofthispermission.

2                    Thedevelopment herebypermitted shallbe carriedout incompleteaccordancewiththeapproveddrawings andspecifications:

PROPOSEDSITEPLANSC/18/01REV.A;

SOFT LANDSCAPINGPLAN NR.723.01 REV.A

EXISTINGANDPROPOSEDSITEPLANSC/18/P101REV.APLOT1 &2 PROPOSEDELEVATIONSSC/18/P103REV.APLOT1 &2 PROPOSEDPLANSSC/18/P102

BLOCK PLAN &LOCATION PLAN SC/18/OM SITESETUPPLANSC/18/02CONSTRUCTIONMETHODSTATEMENT

DETAILSOFEXTERNAL MATERIALS(BRICKS, TILESANDPAVING)SOFTLANDSCAPING& PLANTING SPECIFICATION

3               Thehard landscapeworks,asshownon drawingPROPOSEDSITE PLANSC/18/01REV.A,shallbe carriedout asapprovedprior tothebeneficial occupationof thedevelopment herebyapprovedunless otherwisefirst agreedinwritingby thelocalplanning authority. Thesoftlandscapeworks,asshown    ondrawing SOFTLANDSCAPING PLAN NR.723.01 REV.A andSOFTLANDSCAPING& PLANTINGSPECIFICATION, shallbe carriedout asapprovedwithinthefirst availableplanting season(October toMarchinclusive)following thecommencementof thedevelopment, unlessotherwise firstagreedinwritingby thelocalplanning authority.If withina period offive yearsfrom thedate oftheplanting ofanytreeor plantthattree orplant, oranytreeor plantplanted initsreplacement, isremoved, uprooted,destroyed, dies,or becomes,intheopinion ofthelocalplanning authority,seriouslydamaged ordefective, anothertreeor plantof thesamespeciesandsizeasthat   originallyplanted shallbe plantedinthesameplace, unlessthelocalplanning authoritygives itswrittenconsenttoanyvariation.

4               Thecarparking spaceshereby approvedshallbe providedprior tothefirst beneficialoccupation ofthedwellings herebypermitted andshallbe permanentlyretained thereafterfor theparking ofprivate motorvehicles solelyfor thebenefit oftheoccupants ofthedwellings herebyapprovedandtheirvisitors andfor noother purpose.

5               Thefoul drainagescheme,shownon drawingSC/18/01REV.A;shallbe implementedprior tothefirst occupationof thedevelopment.

6               Nodevelopment shalltakeplace untildetails ofthesurfacewaterdrainage schemetoservethedevelopment havebeen submittedtoandagreedinwritingby thelocalplanning authority.Theagreedschemeshallbe implementedprior tothefirst occupationof thedevelopment.

7               TheapprovedConstructionMethodStatementreceived on7 June2018 shallbe adheredtothroughouttheconstructionperiod.

8               Notwithstandingtheprovisions ofSchedule2 Part 1 ClassesB andC oftheTown& CountryPlanning(General PermittedDevelopment)Order2015 (oranyOrderamending,revoking orre-enacting thatOrder),thereshallbe noalterationsor additionstotheroofs ofthedwellings.

9               Thedevelopment shallonly beundertaken infull compliancewiththeapproveddetails, asshownon drawingSC/18/02,for theprotection ofpersons usingthepublic footpathadjacenttothesiteduring theconstructionperiod.

Supporting documents: