Application Number 

25/00730/FUL 

Location 

Land West of 8 Captains Wood Road, Great Totham  

Proposal 

Proposed self-build 4-bedroom detached house, garage and driveway. 

Applicant 

Nicholas Carlton 

Agent 

Target Decision Date 

06.02.2026 (EoT – committee determination required) 

Case Officer 

Matt Bailey 

Parish 

Great Totham 

Reason for Referral to the Committee / Council 

Departure from the local plan  

 

The Officer presented the report.

 

Following this Councillor R H Siddall proposed that they approve this application. This was duly seconded.

 

Upon a vote being taken this proposal was accepted.

 

RESOLVED that this application be APPROVEDsubject to the following conditions:

1.              The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 
 

2.              The development hereby permitted shall be carried out in accordance with the following approved plans stated on the Decision Notice  

 

3          The materials used in the construction of the development hereby approved shall be as set out within the application form/approved plans and Design and Access Statement. 
 

4          No development works above ground level shall occur until details of the surface water drainage scheme to serve the development shall be submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development. The scheme shall ensure that for a minimum: 

1)         The development should be able to manage water on site for 1 in 100 year events plus 40% climate change allowance. 

2)         Run-off from a greenfield site for all storm events that have a 100% chance of occurring each year (1 in 1 year event) inclusive of climate change should be no higher than 10/ls and no lower than 1/ls. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage minimum rate 1l/s) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) 

 

You are advised that in order to satisfy the soakaway condition the following details will be required:- details of the area to be drained, infiltration rate (as determined by BRE Digest 365), proposed length, width and depth of soakaway, groundwater level and whether it will be rubble filled. 

 

Where the local planning authority accepts discharge to an adopted sewer network you will be required to provide written confirmation from the statutory undertaker that the discharge will be accepted. 

 

5          Prior to first occupation of the dwelling hereby approved, the foul drainage for the dwelling must either be connected to mains drainage or a small sewage treatment plant of adequate capacity for the dwelling. Any small sewage treatment plant installed must discharge treated effluent in a manner which complies with the "General Binding Rules" at the time of installation. 

 

6          Prior to the commencement of the development the applicant shall submit in writing a construction management plan to the local planning authority for approval. Within the construction management plan it must consider the following requirements: 

 

The applicant should ensure the control of nuisances during construction works to preserve the amenity of the area and avoid nuisances to neighbours and to his effect: 

 

a)         no waste materials should be burnt on the site, instead being removed by licensed waste contractors; 

b)         no dust emissions should leave the boundary of the site; 

c)         consideration should be taken to restricting the duration of noisy activities and in locating them away from the periphery of the site; 

d)         hours of works: works should only be undertaken between 08:00 hours and 1800 hours on weekdays; between 0800 hours and 1300 hours on Saturdays and not at any time on Sundays and Public Holidays. 
 

7.         Prior to first occupation of the development the upgraded vehicle access shall be provided as shown in principle on planning drawing no. BPHDE03_HWAY. The access shall be provided with an appropriate dropped kerb vehicular crossing of the footway. The vehicular visibility splays shall be provided before the access is first used by vehicular traffic and retained free of any obstruction at all times. 

 

8.         No unbound material shall be used in the surface treatment of the vehicular access within 6 metres of the highway boundary. 
 

9.         Prior to first occupation of the development, cycle parking shall be provided in accordance with Maldon District Council’s Parking Standards. The approved facilities shall be secure, convenient, covered and retained at all times. 

 

10        Prior to first occupation of the development, the Developer shall be responsible for the provision, implementation and distribution of Residential Travel Information Packs for sustainable transport, as approved by Essex County Council, to include six one day travel vouchers for use with the relevant local public transport operator. This pack (including tickets) is to be provided by the Developer to the dwelling free of charge. 

 

11        No development shall commence until information has been submitted and approved in writing by the local planning authority in accordance with the requirements of BS5837:2012 in relation to tree retention and protection as follows: 

·       Tree survey detailing works required 

·       Trees to be retained 

·       Tree retention protection plan 

·       Tree constraints plan 

·       Arboricultural implication assessment 

·       Arboricultural method statement (including drainage service runs and construction of hard surfaces) 

 

The protective fencing and ground protection shall be retained until all equipment, machinery and surplus materials have been removed from the site. If within five years from the completion of the development an existing tree is removed, destroyed, dies, or becomes, in the opinion of the local planning authority, seriously damaged or defective, a replacement tree shall be planted within the site of such species and size and shall be planted at such time, as specified in writing by the local planning authority. The tree protection measures shall be carried out in accordance with the approved detail. 

 

12.       A Mobile Species Method Statement shall be submitted to and approved in writing by the local planning authority. This will contain precautionary mitigation measures and/or works to reduce potential impacts to hedgehogs and other small mammals during the construction phase. 

The measures and/works shall be carried out strictly in accordance with the approved details and shall be retained in that manner thereafter. 

13        Prior to any works above slab level, a Biodiversity Enhancement Strategy for protected, Priority and threatened species, prepared by a suitably qualified ecologist, shall be submitted to and approved in writing by the local planning authority. 

 

The content of the Biodiversity Enhancement Strategy shall include the following: 

 

a)         Purpose and conservation objectives for the proposed enhancement measures; 

b)         detailed designs or product descriptions to achieve stated objectives; 

c)         locations of proposed enhancement measures by appropriate maps and plans (where relevant); 

d)         persons responsible for implementing the enhancement measures; and 

e)         details of initial aftercare and long-term maintenance (where relevant). 

 

The works shall be implemented in accordance with the approved details shall be retained in that manner thereafter.