To consider the report of the Assistant Director: Planning and Implementation, (copy enclosed, Members’ Update to be circulated)*.
Minutes:
|
Application Number |
25/00186/OUT |
|
Location |
Land At The Brambles, Latchingdon Road, Cold Norton |
|
Proposal |
Outline application with all matters reserved for the erection of 1 no dwelling |
|
Applicant |
Mr Wayne Stanley |
|
Agent |
Mr Mike Otter - GPO Designs Ltd |
|
Target Decision Date |
20.06.2025 (EoT – committee determination required) |
|
Case Officer |
Matt Bailey |
|
Parish |
PURLEIGH |
|
Reason for Referral to the Committee / Council |
Departure from the Local Plan |
Following the Officer’s presentation the Agent Mr Otter addressed the committee.
Councillor S White proposed that the Officer’s recommendation to approve the application be agreed. This proposal was duly seconded.
Following some discussion the Chairperson put Councillor Whites’ proposal to the committee and was unanimously agreed.
Then Councillor White left the meeting at this point and did not return.
RESOLVEDthat the application be APPROVED subject to the conditions below and the submitted Unilateral Undertaking.
1. The development shall be carried out in accordance with plans and particulars relating to the access, appearance, landscaping, layout and scale of the site (hereinafter called "the reserved matters"), for which approval shall be obtained from the Local Planning Authority in writing before any development is begun. The development shall be carried out fully in accordance with the details as approved.
2. Application(s) for the approval of the reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission.
3. The development hereby permitted shall be begun within two years from the date of the final approval of the reserved matters. The development shall be carried out as approved.
4. The development hereby permitted shall be carried out in accordance with Brown & Cos site location plan.
5. If not first approved as part of any application for approval of reserved matters pursuant to condition 1 of this permission no works above ground level shall take place until written details of the proposed materials to be used in the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out using the materials and details as approved.
6. If not first approved as part of any application for approval of reserved matters pursuant to condition 1 of this permission no works above ground level shall take place until full details of hard and soft landscape works have been submitted to and approved in writing by the Local Planning Authority. These details shall include:
i. Proposed finished levels contours;
ii. Means of enclosure;
iii. Car parking layouts;
iv. Other vehicle and pedestrian access and circulation areas;
v. Hard surfacing materials;
vi. Minor artefacts and structures (e.g. furniture, play equipment, refuse or other storage units, signs, lighting);
vii. Proposed and existing functional services above and below ground (e.g. drainage power, communications cables, pipelines etc, indicating lines, manholes, supports);
viii. Retained historic landscape features and proposals for restoration, where relevant.
The soft landscape works shall be carried out as approved within the first available planting season (October to March inclusive) following the occupation of any part of the development hereby approved unless otherwise agreed in writing by the Local Planning Authority. If within a period of five years from the date of the planting of any tree or plant, or any tree or plant planted in its replacement, is removed, uprooted, destroyed, dies, or becomes, in the opinion of the Local Planning Authority, seriously damaged or defective, another tree or plant of the same species and size as that originally planted shall be planted in the same place, unless the Local Planning Authority gives its written consent to any variation.
The hard landscape works shall be carried out as approved prior to the first use / occupation of the development hereby approved and retained and maintained as such thereafter.
7. If not first approved as part of any application for approval of reserved matters pursuant to condition 1 of this permission no development shall commence until satisfactory information has been submitted and approved in writing by the Local Planning Authority in accordance with the requirements of BS5837:2012 in relation to tree retention and protection as follows:
§ Tree Protection Plan
§ Arboricultural Impact Assessment
§ Arboricultural Method Statement (including drainage service runs and construction of hard surfaces)
The protective fencing and ground protection shall be retained until all equipment, machinery and surplus materials have been removed from the site. If within five years from the completion of the development an existing tree is removed, destroyed, dies, or becomes, in the opinion of the Local Planning Authority, seriously damaged or defective, a replacement tree shall be planted within the site of such species and size and shall be planted at such time, as specified in writing by the Local Planning Authority. The tree protection measures shall be carried out in accordance with the approved detail.
9. Prior to first occupation of the development, the Developer shall be responsible for the provision, implementation and distribution of a Residential Travel Information Pack for sustainable transport, approved by Essex County Council, to include six one day travel vouchers for use with the relevant local public transport operator. This pack (including tickets) are to be provided by the Developer to the dwelling free of charge. .
10. No development works above ground level shall occur until details of the surface water drainage scheme to serve the development shall be submitted to and agreed in writing by the Local Planning Authority. The agreed scheme shall be implemented prior to the first occupation of the development. The scheme shall ensure that for a minimum:
1) The development should be able to manage water on site for 1 in 100 year events plus 40% climate change allowance.
2) Run-off from a greenfield site for all storm events that have a 100% chance of occurring each year (1 in 1 year event) inclusive of climate change should be no higher than 10/ls and no lower than 1/ls. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage (minimum rate 1l/s) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield)
11. No development works shall occur above ground level until details of the foul drainage scheme to serve the development have been submitted to and agreed in writing by the Local Planning Authority. The agreed scheme shall be implemented prior to the first occupation of the development.
12. All mitigation measures and/or works shall be carried out in accordance with the details contained in the Preliminary Ecological Appraisal (Skilled Ecology Consultancy, December 2024) as submitted with the application and agreed in principle with the Local Planning Authority prior to determination. This may include the appointment of an appropriately competent person e.g. an Ecological Clerk of Works (ECoW) to provide on-site ecological expertise during construction. The appointed person shall undertake all activities, and
13. No works above ground level shall take place until a Biodiversity Enhancement Strategy for protected and Priority species has been submitted to and approved in writing by the Local Planning Authority. The content of the Biodiversity Enhancement Strategy shall include the following:
a) Purpose and conservation objectives for the proposed enhancement measures;
b) detailed designs or product descriptions to achieve stated objectives;
c) locations, orientations, and heights of proposed enhancement measures by appropriate maps and plans;
d) timetable for implementation demonstrating that works are aligned with the proposed phasing of development;
e) persons responsible for implementing the enhancement measures;
f) details of initial aftercare and long-term maintenance (where relevant).
The works shall be implemented in accordance with the approved details prior to occupation and shall be retained in that manner thereafter.
14. Prior to installation of any external lighting, a scheme for sensitive lighting shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall identify those features on site that are particularly sensitive for bats and that are likely to cause disturbance along important routes used for foraging; and show how and where external lighting will be installed (through the provision of appropriate, contour plans, drawings and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent bats using their territory. All external lighting shall be installed in accordance with the specifications and locations set out in the scheme and maintained thereafter in accordance with the scheme. Under no circumstances should any other external lighting be installed without prior consent from the Local Planning Authority.
15. No development shall take place, including any ground works or demolition, until a Construction Management Plan has been submitted to, and approved in writing by, the Local Planning Authority. The approved plan shall be adhered to throughout the construction period. The Plan shall provide for:
a. the parking of vehicles of site operatives and visitors,
b. loading and unloading of plant and materials,
c. storage of plant and materials used in constructing the development,
d. wheel and underbody washing facilities.
e. no waste materials should be burnt on site, instead being removed by licensed waste contractors.
f. no dust emissions should leave the boundary of the site.
g. consideration to restricting the duration of noisy activities and in locating them away from the periphery of the site.
h. hours of works undertaken only between 0730 hours and 1800 hours on weekdays; between 0800 hours and 1300 hours on Saturdays, and not at any time on Sundays and Public Holidays.