To consider the report of the Assistant Director: Planning and Implementation, (copy enclosed, Members’ Update to be circulated)*.
Minutes:
|
Application Number |
24/00817/FUL |
|
Location |
South Menage at Chasefield Farm 64 Walden House Road Great Totham |
|
Proposal |
Removal of existing menage and construction of new detached two storey dwelling with detached cart lodge, access, parking and landscaping. |
|
Applicant |
Mr & Mrs Edwards |
|
Agent |
Mr Mark Rickards - Bacchus Design Limited |
|
Target Decision Date |
20.06.2025 (Time Extended Agreed with Agent) |
|
Case Officer |
Chris Purvis |
|
Parish |
GREAT TOTHAM |
|
Reason for Referral to the Committee / Council |
Departure from the Local Plan |
Following the Officer’s presentation the Agent Mr Rickards addressed the committee.
Following some discussion Councillor S J N Morgan proposes that the Officer’s recommendation to approve the application be agreed. This proposal was duly seconded and agreed by assent.
RESOLVED that this application be APPROVED subject to the applicant entering into a legal agreement pursuant to Section 106 of the Town and Country Planning Act 1990 (as amended) to secure the planning obligations and subject to conditions as detailed below.
HEADS OF TERMS FOR SECTION 106 AGREEMENT
Section 106 legal agreement
A financial contribution of £169.45 for mitigating the impact upon the ZoI of the Essex
Coast RAMS as new residential development is likely to have a significant effect on
the sensitive interest features of these coastal European designated sites, through
increased recreational pressure when considered ‘in combination’ with other plans
and projects.
1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
2 The development hereby permitted shall be carried out in complete accordance with the approved plans as identified above.
3 No development above slab level shall commence until written details or samples of all materials to be used in the construction of the external surfaces of the development and the site boundaries hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out using the materials and details as approved.
4 No development above slab level shall take place until full details of both hard and soft landscape works to be carried out have been submitted to and approved in writing by the Local Planning Authority. These details shall include the layout of the hard landscaped areas with the materials and finishes to be used and details of the soft landscape works including schedules of shrubs and trees to be planted, noting the species, stock size, proposed numbers/densities and details of the planting scheme’s implementation, aftercare and maintenance programme. The hard landscape works shall be carried out as approved prior to first occupation of the development hereby approved unless otherwise first agreed in writing by the Local Planning Authority. The soft landscape works shall be carried out as approved within the first available planting season (October to March inclusive) following the commencement of the development, unless otherwise first agreed in writing by the Local Planning Authority. If within a period of five years from the date of the planting of any tree or plant, or any tree or plant planted in its replacement, is removed, uprooted, destroyed, dies, or becomes, in the opinion of the Local Planning Authority, seriously damaged or defective, another tree or plant of the same species and size as that originally planted shall be planted in the same place, unless the Local Planning Authority gives its written consent to any variation.
5 Notwithstanding the provisions of Schedule 2, Part 1 Class E of the Town & Country Planning [General Permitted Development] Order 2015 [or any order revoking and re-enacting that Order with or without modification] no building/outbuilding, enclosure, swimming or other pool, container, veranda/balcony/raised platform shall be carried out on the site without planning permission having been obtained from the Local Planning Authority.
6 Prior to first occupation of the development, the access at its centre line shall be provided with a clear to ground visibility splay with dimensions of 2.4 metres by 43 metres in each direction as measured from and along the nearside edge of the carriageway. Such vehicular visibility splays shall be submitted to and approved in writing by the Local Planning Authority before the access is first used by vehicular traffic. The vehicular visibility splays as approved shall be retained free of any obstruction at all times thereafter.
7 Prior to first occupation of the development, details of the proposed new vehicular access shall be submitted to and approved in writing by the Local Planning Authority. The details shall demonstrate that the proposed new vehicular access shall be constructed at right angles to the highway boundary and to the existing carriageway. The width of the access at its junction with the highway shall be no more than 3.6 metres and shall be provided with an appropriate dropped kerb vehicular crossing of the footway. The proposed new vehicular access shall be implemented as approved and maintained and retained at all times thereafter.
8 No unbound material shall be used in the surface treatment of the vehicular access within 6 metres of the highway boundary.
9 Any gates provided at the vehicular access shall be inward opening only and shall be set back a minimum of 6 metres from the back edge of the carriageway.
10 Prior to first occupation of the development, the Developer shall be responsible for the provision, implementation and distribution of a Residential Travel Information Pack for sustainable transport, approved by Essex County Council, to include six one day travel vouchers for use with the relevant local public transport operator. This pack (including tickets) is to be provided by the Developer to the dwelling free of charge.
11 No development works above ground level shall occur until details of the surface water drainage scheme to serve the development shall be submitted to and agreed in writing by the Local Planning Authority. The scheme shall ensure that for a minimum:
1) The development shall need to manage water on site for 1 in 100 year events plus 40% climate change allowance.
2) Run-off from a greenfield site for all storm events that have a 100% chance of occurring each year (1 in 1 year event) inclusive of climate change shall be no higher than 10/ls and no lower than 1/ls. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage (minimum rate 1l/s) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield)
You are advised that in order to satisfy the soakaway condition the following details will be required: details of the area to be drained, infiltration rate (as determined by BRE Digest 365), proposed length, width and depth of soakaway, groundwater level and whether it will be rubble filled.
Where the Local Planning Authority accepts discharge to an adopted sewer network you will be required to provide written confirmation from the statutory undertaker that the discharge will be accepted.
The approved scheme shall be implemented prior to the first occupation of the development and be retained for that purpose at all times thereafter.
12 No development works above ground level shall occur until details of the foul drainage scheme to serve the development have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented prior to the first occupation of the development and then maintained and retained at all times thereafter.
13 Any contamination that is found during the course of construction of the approved development that was not previously identified shall be reported immediately to the Local Planning Authority. Development on the part of the site affected shall be suspended and a risk assessment carried out and submitted to and approved in writing by the Local Planning Authority. Where unacceptable risks are found remediation and verification schemes shall be submitted to the Local Planning Authority for approval in writing. These approved schemes shall be carried out before the development is resumed or continued. Following completion of measures identified in the approved remediation scheme, a verification report demonstrating the effectiveness of the remediation scheme carried out shall be submitted to the Local Planning Authority for approval in writing.
14 All mitigation measures and/or works shall be carried out in accordance with the details contained in the Preliminary Ecological Appraisal (Hybrid Ecology, October 2024). This may include the appointment of an appropriately competent person e.g., an Ecological Clerk of Works (ECoW) to provide on-site ecological expertise during construction. The appointed person shall undertake all activities, and works shall be carried out, in accordance with the approved details.
15 No works above ground level shall take place until a Biodiversity Enhancement Strategy for protected and Priority species shall be submitted to and approved in writing by the Local Planning Authority. The content of the Biodiversity Enhancement Strategy shall include the following:
Purpose and conservation objectives for the proposed enhancement measures;
Detailed designs or product descriptions to achieve stated objectives;
Locations, orientations, and heights of proposed enhancement measures by appropriate maps and plans;
Timetable for implementation;
Persons responsible for implementing the enhancement measures;
Details of initial aftercare and long-term maintenance (where relevant).
The works shall be implemented in accordance with the approved details prior to occupation and shall be retained in that manner thereafter.
16 Prior to installation of any external lighting, a lighting design scheme for biodiversity shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall identify how lighting impacts will be avoided upon the Essex Estuaries Special Area of Conservation (SAC) and the Crouch and Roach Estuaries Special Protection Area (SPA), Ramsar and Sites of Special Scientific Interest (SSSI) and show how and where external lighting will be installed (through the provision of appropriate lighting plans, drawings and technical specifications) so that it can be clearly demonstrated that lighting will not result in impacts upon the statutory designated sites. All external lighting shall be installed in accordance with the specifications and locations set out in the scheme and maintained thereafter in accordance with the scheme. Under no circumstances should any other external lighting be installed without prior consent from the Local Planning Authority.