22/01005/FUL - Land at Theedhams Farm, David Fisher Way, Southminster, CM0 7BD

To consider the report of the Director of Service Delivery, (copy enclosed, Members’ Update to be circulated)*.

Minutes:

Application Number

22/01005/FUL

Location

Land at Theedhams Farm, David Fisher Way, Southminster, CM0 7BD

Proposal

New medical practice with dispensary retail unit and other ancillary uses together with access onto David Fisher Way; associated car parking facilities and other hard and soft landscaping works.

Applicant

Assura Aspire Ltd

Agent

Mr M. Robinson - Simpson Hilder Associates

Target Decision Date

17.02.2023  EoT to 28.07.2023

Case Officer

Jonathan Doe

Parish

SOUTHMINSTER

Reason for Referral to the Committee / Council

Call in by Councillor A S Fluker with reference to policies D1 and E3. The proposal is a Major development outside a defined settlement boundary

 

Councillor M G Bassenger requested his disagreement to continue the meeting due to the continued technical issues be noted. During the Officers presentation the Officer suggested an amendment to condition 3 of the report to change the level of obscured glass from level 1 to level 5 on the 'Pilkington' scale of obscuration and that should Members be mindful to approve the application this amendment would be included with guidance to the wording from Senior Officers.

 

Following the Officers presentation, a Supporter Mrs Message and Dr Philips (speaking on behalf of the Applicant), addressed the committee. The Chairperson then opened the discussion.

 

Councillor Fluker proposed that the application be approved, in line with the Officers recommendation, and this was duly seconded.

 

A debate ensued, after which and in accordance with Procedure Rule No. 13 (3) Councillor A S Fluker requested a recorded vote. This was duly seconded and the voting was as follows: 

 

For the recommendation:

Councillors M G Bassenger, V J Bell, D O Bown, A Fittock, A S Fluker, M G Neall and L J Haywood.

 

Against the recommendation:

None.

 

Abstention:

None.

 

The Chairperson declared that the application was therefore approved subject to an amendment to Condition 3 as detailed by the Officer.

 

RESOLVED that the application be APROVED subject to the following conditions:

 

1.         The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

2.         The development hereby permitted shall be carried out in accordance with the following approved plans and documents:

           9412-P001 Rev B Block and location plan

           9412-P002A Existing site plan

           9412-P003B Proposed site plan

           9412-P004 Rev B Proposed ground and first floor plans

           9412-(2-) 001 Proposed ground floor plan

           9412-(2-) 002 Proposed first floor plan

           9412-P005 Rev E Proposed elevations

           9412-P006 Rev B Proposed roof plan

           9412-P007 Rev B Streetscene

           Design and access statement issue 02

           Geo-Environmental Assessment by Delta Simons dated June 2022

           Flood Risk Assessment and drainage report by Civic Engineers dated 1 September 2022

           Flood Risk Assessment and drainage report by Civic Engineers dated 22 August 2022

           External Light Management Strategy

           Transport Statement by Rossi Long Consulting dated August 2022

           Environmental Noise Assessment by Hunter Acoustics dated 08/09/2022

           Preliminary Ecological Appraisal by Geosphere Environmental dated 08/09/2022

           Flood Response Plan by Simpson Hilder Associates Ltd

3.         Notwithstanding the elevation drawing hereby approved, prior to the first occupation of the building hereby permitted, windows in the upper floor to the northern elevation of the building shall be non-opening, with the exception of any top hung fanlight (which shall be at least 1.7m above internal floor level),  and glazed using obscured glass to level 5 on the 'Pilkington' scale of obscuration and those windows shall remain permanently glazed as such thereafter.

4.         Prior to the first use of the development the vehicular access as shown on the approved plans shall be provided with a dropped kerb crossing of the footway with all details to be agreed with the Highway Authority. The visibility splays and vegetation height shall be maintained as shown on the approved plan for the life of the development.

5.         Prior to first use of the development the vehicle parking and turning areas as indicated on the approved plans shall be provided with the turning areas being hard surfaced, sealed and marked out and the parking spaces being marked out. The parking and turning areas shall be retained in perpetuity as such for their intended purpose. No hard-standing areas to be constructed until the works have been carried out in accordance with a drainage strategy.

6.         Prior to the commencement of the development the applicant shall submit in writing a construction management plan to the local planning authority for approval. Within the construction management plan it must consider the following requirements:

 

The applicant should ensure the control of nuisances during construction works to preserve the amenity of the area and avoid nuisances to neighbours and to this effect:

a)         no waste materials should be burnt on the site, instead being removed by licensed waste contractors;

b)         no dust emissions should leave the boundary of the site;

c)         consideration should be taken to restricting the duration of noisy activities and in locating them away from the periphery of the site;

d)         hours of works: works should only be undertaken between 0730 hours and 1800 hours on weekdays; between 0800 hours and 1300 hours on Saturdays and not at any time on Sundays and Public Holidays.

 

If it is known or there is the likelihood that there will be the requirement to work outside of these hours or there will be periods where there will be excessive noise that will significantly impact on sensitive receptors Environmental Health at Maldon District Council must be notified prior to the works as soon as is reasonably practicable. The developer is advised to consult nearby sensitive noise premises and may be advised to apply for a Prior Consent under Section 61 of the Control of Pollution Act 1974.

 

Care must be taken to prevent the pollution of ground and surface waters. This will include during works and the location of any hazardous materials including fuel from vehicles and equipment.

 

Where any soils that are known to be contaminated are being excavated or exposed a site waste plan must be prepared in order to store treat and dispose of the materials in accordance with the waste duty of care. It is recommended that advice is sought from the Environment Agency on this matter.

 

Where there is requirement for dewatering the site the relevant consent must be sought from the Environment Agency.

 

Where there is a requirement to obstruct or alter watercourses a consent under section 23 of the Land Drainage Act must be obtained from Essex County Council.

7.         Should the existence of any contaminated ground or groundwater and/or hazardous soil gases be found that were not previously identified or not considered in a scheme agreed in writing with the Local Planning Authority, it must be reported in writing immediately and a risk assessment of the site shall be undertaken and a scheme to bring the site to a suitable condition shall be submitted to and agreed in writing with the Local Planning Authority. A "suitable condition" means one in that represents an acceptable risk to human health, the water environment, property and ecosystems and scheduled ancient monuments and cannot be determined as contaminated land under Part 2A of the Environmental Protection Act 1990 now or in the future.

 

The work will be undertaken by a competent person in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination (CLR 11), the Essex Contaminated Land Consortium's Land Contamination Technical Guidance For Applicants and Developers and current UK best-practice guidance and policy.

8.         No extraction or ventilation equipment, vents, air conditioning units or similar plant equipment including air source heat pumps shall be installed or fitted to any external part of the building except in accordance with a scheme to be submitted to and approved in writing by the local planning authority. The scheme as approved and installed shall be retained as such thereafter.

9.         Notwithstanding the information already provided in respect of the external lighting scheme, further details of the spread of light and operating hours of the lights shall be submitted to and approved in writing by the local planning authority prior to first use of the development hereby approved. All illumination within the site shall be retained in accordance with the approved details. There shall be no other lighting of the external areas of the site unless otherwise agreed in writing by the local planning authority.

10.       Prior to construction above damp-proof course a scheme for biodiversity net gain and nature conservation enhancement of the site, along the lines referred to in the Preliminary Ecological Appraisal (Geo Environmental, September 2022), shall have been submitted to and approved in writing by the local planning authority. This may include the appointment of an appropriately competent person e.g. an ecological clerk of works (ECoW) to provide on-site ecological expertise during construction. The appointed person shall undertake all activities, and works shall be carried out, in accordance with the approved details. The content of the Biodiversity Enhancement Strategy shall include the following:

a)         Purpose and conservation objectives for the proposed enhancement measures;

b)         detailed designs or product descriptions to achieve stated objectives;

c)         locations, orientations, and heights of proposed enhancement measures by appropriate maps and plans;

d)         timetable for implementation demonstrating that works are aligned with the proposed phasing of development;

e)         persons responsible for implementing the enhancement measures;

f)          details of initial aftercare and long-term maintenance (where relevant).

 

The scheme as approved shall be implemented prior to first use of the development hereby approved and retained as such.

11.       Prior to first construction a Great Crested Newt Method Statement shall be submitted to and approved in writing by the local planning authority. This will contain precautionary mitigation measures and/or works to reduce potential impacts to Great Crested Newt during the construction phase. The measures and/works shall be carried out strictly in accordance with the approved details and shall be retained in that manner thereafter.

12.       Prior to the construction above damp-proof course, a scheme for on-site foul water drainage works, including connection point and discharge rate, shall be submitted to and approved in writing by the Local Planning Authority. Prior to the occupation of any phase, the foul water drainage works relating to that phase must have been carried out in complete accordance with the approved scheme. The agreed scheme shall be implemented prior to the first use or occupation of the building hereby permitted.

13.       No development works above ground level shall occur until details of a surface water drainage scheme to serve the development have been submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development. The scheme shall ensure that for a minimum: 1) The development should be able to manage water on site for 1 in 100 year events plus 40% climate change allowance. 2) Run-off from a greenfield site for all storm events that have a 100% chance of occurring each year (1 in 1 year event) inclusive of climate change should be no higher than 10/ls and no lower than 1/ls. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage (minimum rate 1l/s) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) You are advised that in order to satisfy the soakaway condition the following details will be required:- details of the area to be drained, infiltration rate (as determined by BRE Digest 365), proposed length, width and depth of soakaway, groundwater level and whether it will be rubble filled. Where the local planning authority accepts discharge to an adopted sewer network you will be required to provide written confirmation from the statutory undertaker that the discharge will be accepted.

14.       Details of an appropriate level of treatment for all rainwater runoff leaving the site, with particular regard to treatment to water from the roof of the medical practice, in line with the Simple Index Approach in chapter 26 of the CIRIA SuDS Manual C753, shall be submitted to and approved in writing by the local planning authority prior to construction of the medical practice building above ground level. The details as approved shall be implemented and retained as approved.