Agenda item

22/01206/FUL - Land Adjacent Brickfields Cottage, Green Lane, Burnham-on-Crouch

To consider the report of the Director of Service Delivery (copy enclosed, Members’ Update to be circulated)*.

Minutes:

Application Number

22/01026/FUL

Location

Land Adjacent Brickfields Cottage, Green Lane, Burnham-on-Crouch

Proposal

Erection of a detached chalet bungalow

Applicant

Miss K Hewson

Agent

Elisa Hampson - E. H Planning Services

Target Decision Date

24.11.2022

Case Officer

Jonathan Doe

Parish

BURNHAM NORTH

Reason for Referral to the Committee / Council

Departure from the Local Plan 2017

 

Following the Officer’s presentation the Chairman opened the discussion. Councillor W Stamp proposed that the application be approved as per the Officer’s recommendation and this was duly seconded by Councillor M W Helm. The Chairman put the proposal to agree the application to the Committee and it was approved.

 

RESOLVED that the application be APPROVED subject to the following conditions:

1         The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

2         The development hereby permitted shall be carried out in complete accordance with approved drawings: Site location plan at 1:1250 Rev A; Block plan 008 C; Floor plans 006; and, Elevations 007.

3         Prior to their use in the development hereby approved, details or samples of the materials to be used in the construction of the external surfaces, including windows and doors, of the development hereby approved shall have been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details.

4         Prior to the occupation of the development hereby approved details of the boundary treatment of the site shall be submitted to and approved in writing by the Local Planning Authority. The boundary treatment shall be provided prior to the occupation of the dwelling hereby approved in accordance with the approved details and be retained as such in perpetuity.

5         Prior to the occupation of the development details of both hard and soft landscape works, including the retention of the existing hedgerows along the south, east and west boundaries of the application site, to be carried out shall have been submitted to and approved in writing by the Local Planning Authority. These details shall include the layout of the hard landscaped areas with the materials and finishes to be used and details of the soft landscape works including schedules of shrubs and trees to be planted, noting the species, stock size, proposed numbers/densities and details of the planting scheme's implementation, aftercare and maintenance programme. The hard landscape works shall be carried out as approved prior to the beneficial occupation of the development hereby approved unless otherwise first agreed in writing by the Local Planning Authority. The soft landscape works shall be carried out as approved within the first available planting season (October to March inclusive) following the occupation of the development, unless otherwise first agreed in writing by the Local Planning Authority. If within a period of five years from the date of the planting of any tree or plant, or any tree or plant planted in its replacement, is removed, uprooted, destroyed, dies, or becomes, in the opinion of the Local Planning Authority, seriously damaged or defective, another tree or plant of the same species and size as that originally planted shall be planted in the same place, unless the Local Planning Authority gives its written consent to any variation.

6         All loading / unloading / reception and storage of building materials and the manoeuvring of all vehicles, including construction traffic shall be undertaken within the application site, clear of the public highway.

7         Prior to the commencement of the development details of the surface water drainage scheme to serve the development shall be submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development. The scheme shall ensure that for a minimum: 1) The development should be able to manage water on site for 1 in 100 year events plus 40% climate change allowance. 2) Run-off from a greenfield site for all storm events that have a 100% chance of occurring each year (1 in 1 year event) inclusive of climate change should be no higher than 10/ls and no lower than 1/ls. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage (minimum rate 1l/s) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) You are advised that in order to satisfy the soakaway condition the following details will be required:- details of the area to be drained, infiltration rate (as determined by BRE Digest 365), proposed length, width and depth of soakaway, groundwater level and whether it will be rubble filled.

8         No development works above ground level shall occur until details of the foul drainage scheme to serve the development has been submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development

9         The double garage, vehicle parking area and associated turning facilities shown on plan 008C shall be provided prior to the occupation of the dwelling and be retained as such in perpetuity. The garage and off-street parking shall not be used for any purpose other than the parking of vehicles that are related to the use of the development unless otherwise agreed with the Local Planning Authority.

10     Details of the refuse and cycle stores shall be submitted to and approved in writing by the Local Planning Authority prior to the first occupation of the development. The development shall be implemented in accordance with the approved details and be retained for such purposes in perpetuity thereafter.

11     Any contamination that is found during the course of construction of the approved development that was not previously identified shall be reported immediately to the Local Planning Authority. Development on the part of the site affected shall be suspended and a risk assessment carried out and submitted to and approved in writing by the Local Planning Authority. Where unacceptable risks are found remediation and verification schemes shall be submitted to the Local Planning Authority for approval in writing. These approved schemes shall be carried out before the development is resumed or continued. Following completion of measures identified in the approved remediation scheme, a verification report demonstrating the effectiveness of the remediation scheme carried out must be submitted to the Local Planning Authority for approval in writing.     

12     Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extension or separate building (other than ancillary outbuildings not exceeding 10 cubic metres in volume) shall be erected within the site.

13     No unbound material shall be used in the surface treatment of the vehicular access within 6 metres of the highway boundary.

14     There shall be no discharge of surface water from the development onto the Highway.

Supporting documents: