Agenda item

24/00170/HOUSE - Oak Cottage, Howe Green Road, Purleigh, Chelmsford, Essex, CM3 6PZ

To consider the report of the Assistant Director: Planning and Implementation, (copy enclosed, Members’ Update to be circulated)*.

Minutes:

Application Number

24/00170/HOUSE

Location

Oak Cottage, Howe Green Road, Purleigh, Chelmsford, Essex, CM3 6PZ

Proposal

Proposed two-storey extension with a glass link and alterations to fenestration including removal of existing porch and replacement porch canopy. New cart lodge and associated hard and soft landscaping to front and rear including patio area with outdoor kitchen, oil tank and air con unit.

Applicant

Mr Stuart Bushby

Agent

Miss Dominika Zakowana

Target Decision Date

02.05.2024

Case Officer

J.Kirkaldy

Parish

PURLEIGH

Reason for Referral to the Committee / Council

Member Call In – Councillor S White regarding Policies S1 & D1

 

Following the Officer’s presentation, the Applicant, Mr Bushby addressed the Committee. The Chairperson then opened the floor for debate.

 

Councillor M F L Durham proposed that the application be approved in accordance with the Officer’s recommendation. This proposal was duly seconded and when put to the Committee by the Chairperson, it was agreed.

 

RESOLVED that the application be approved subject to the following conditions:

 

1.         The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

2.         The development hereby permitted shall be carried out in accordance with the approved plans as shown on the decision notice.

3.         The materials used in the construction of the development hereby approved shall be as set out within the application form/plans.

4.         No development works above ground level shall occur until details of the surface water drainage scheme to serve the development shall be submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development. The scheme shall ensure that for a minimum:

 

1)         The development should be able to manage water on site for 1 in 100-year events plus 40% climate change allowance.

2)         Run-off from a greenfield site for all storm events that have a 100% chance of occurring each year (1 in 1 year event) inclusive of climate change should be no higher than 10/ls and no lower than 1/ls. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage (minimum rate 1l/s) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield).

 

You are advised that in order to satisfy the soakaway condition the following details will be required: details of the area to be drained, infiltration rate (as determined by BRE Digest 365), proposed length, width and depth of soakaway, groundwater level and whether it will be rubble filled. Where the local planning authority accepts discharge to an adopted sewer network you will be required to provide written confirmation from the statutory undertaker that the discharge will be accepted.

5.         No development works above ground level shall occur until details of the foul drainage scheme to serve the development shall be submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development.

6.         The extension hereby approved shall not be occupied as a separate or independent dwelling, or any such works carried out to sever the extension from the existing dwelling to create the same.

 

Supporting documents: